Free P6 schedule check

Is your schedule ready to submit?

Drop in a Primavera P6 .xer file. In under a minute you’ll see how it scores against 12 checks reviewers use — missing logic, hard constraints, negative float, long durations and more.

Runs in your browserYour file is never uploaded12 checks
01Load your schedule
Private by design. The file is read by your own browser. Nothing is uploaded — not to us, not to anyone.
How to export an XER from P6
  1. In P6, open the project and go to File → Export.
  2. Choose Primavera PM – (XER) and Project.
  3. Tick the project, pick a file name, and click Finish.
  4. Schedule (F9) first so float and dates are current.
02Your health score
Your score appears here.

Load an .xer file — or try the sample — to run all 12 checks.

Found problems?

A score is a start. A planner reads the logic.

Automated checks find the symptoms. A planner finds the cause — and tells you what to fix before the reviewer sends it back. Send us your result and we’ll reply with what we’d check first.

Send a project brief +1 (350) 250-5011
Built by working planners

Connected by people. Grounded in construction.

16U.S. projects and programmes scheduled
10Sectors, from bridges to data centres
500 kVUnderground transmission line scheduled
$165BLargest programme our planners have worked on