Is your schedule ready to submit?
Drop in a Primavera P6 .xer file. In under a minute you’ll see how it scores against 12 checks reviewers use — missing logic, hard constraints, negative float, long durations and more.

How to export an XER from P6
- In P6, open the project and go to File → Export.
- Choose Primavera PM – (XER) and Project.
- Tick the project, pick a file name, and click Finish.
- Schedule (F9) first so float and dates are current.
Load an .xer file — or try the sample — to run all 12 checks.
–
The 12 checks
See exactly what to fix.
The full report names every activity behind each failed check, explains why reviewers care, and gives you a fix list.
- Activity-by-activity issue lists
- A planner’s fix for each failed check
- Branded PDF report + CSV export
Fix these before your next submission.
Screening based on DCMA 14-point assessment principles, adapted to what an XER export contains. Baseline-dependent metrics (CPLI, BEI, missed tasks) need a baseline comparison and are part of a full review. Indicative only — not a certified audit.
Connected by people. Grounded in construction.
More free tools for contractors.
See all toolsSpec Decoder
Paste the scheduling spec. Get every deadline, limit and submission rule as a checklist.
Open the tool 03Delay Exposure Calculator
See what a late finish costs in liquidated damages and extended overheads — and how much of your margin it eats.
Open the tool 04Notice Clock
Turn a delay event into notice deadlines, calendar reminders and a ready-to-send letter.
Open the tool 05Baseline Readiness Score
Twelve questions that tell you if the job is ready to schedule — and what to study first.
Open the tool 06Planner’s Kit
Sector WBS templates, activity codes, update narratives and notice letters. P6-ready.
Open the tool 07Recovery Options Comparator
Overtime, second shift, more crews or resequencing? Compare the cost of recovering days against the cost of being late.
Open the tool