Recovery needs a construction method.
Overtime, a second shift, more crews or a smarter sequence? Enter the days you need back and what a late day costs. See which option buys time cheapest — and which just burns money.

Adjust assumptions (optional)
–
–See the full comparison.
Days gained, cost, cost per day and net value for every option — plus the combined strategy and the risks a planner would check.
- Side-by-side option table
- Suggested combined strategy
- PDF to take to the project team
Option by option
| Option | Days gained | Added cost | Cost / day | Net value |
|---|
What a planner would check
Simplified, indicative model using the assumptions shown. Real recovery depends on the critical path, access, trade stacking and supply — which is why options should be tested in the schedule.
Connected by people. Grounded in construction.
More free tools for contractors.
See all toolsXER Health Check
Score your P6 schedule against 12 industry checks in under a minute. Your file never leaves your browser.
Open the tool 02Spec Decoder
Paste the scheduling spec. Get every deadline, limit and submission rule as a checklist.
Open the tool 03Delay Exposure Calculator
See what a late finish costs in liquidated damages and extended overheads — and how much of your margin it eats.
Open the tool 04Notice Clock
Turn a delay event into notice deadlines, calendar reminders and a ready-to-send letter.
Open the tool 05Baseline Readiness Score
Twelve questions that tell you if the job is ready to schedule — and what to study first.
Open the tool 06Planner’s Kit
Sector WBS templates, activity codes, update narratives and notice letters. P6-ready.