Baseline scheduling

An executable plan. Connected from day one.

Logic-driven Primavera P6 baselines that align design, procurement and construction with the way the project will be delivered.

SERVICE 02 / 08
01 / INTERFACEDesign02 / INTERFACEProcurement03 / INTERFACEStructure04 / INTERFACEEquipment05 / DRIVERMilestoneILLUSTRATIVE LOGIC / EVERY INTERFACE MATTERS
THE OUTPUTS THAT SUPPORT THE WORK

A clearer basis for execution.

Deliverables are agreed to match the project, schedule requirements and engagement scope.

A useful baseline explains the execution strategy. We develop the work breakdown, calendars and activity logic, then review the paths that control the milestones. Cost and resource loading are available when the engagement requires them.

CPM baseline

A linked schedule with work breakdown, calendars and milestone logic.

Resource planning

Manpower and resource assumptions to review the feasibility of the sequence.

Cost loading

Activity-based cost loading and planned cash-flow outputs when included in scope.

Schedule narrative & requirements

A readable explanation of the planning basis, milestones and drivers, reviewed against the agreed submission requirements.

HOW THE ENGAGEMENT WORKS

From information to an agreed output.

A USEFUL FIRST CONVERSATION

Bring what you have. We’ll define the next step.

  • Schedule requirementsContract specifications, coding requirements and submission dates.
  • Execution informationProcurement priorities, trade packages and construction methods.
  • Milestone basisAccess dates, approvals, handovers and completion requirements.
Keep exploring

Where to next? Follow the loop.

Let’s put a better plan behind your next project.

Start a conversation