CPM baseline
A linked schedule with work breakdown, calendars and milestone logic.
Logic-driven Primavera P6 baselines that align design, procurement and construction with the way the project will be delivered.
SERVICE 02 / 08Deliverables are agreed to match the project, schedule requirements and engagement scope.
A useful baseline explains the execution strategy. We develop the work breakdown, calendars and activity logic, then review the paths that control the milestones. Cost and resource loading are available when the engagement requires them.
A linked schedule with work breakdown, calendars and milestone logic.
Manpower and resource assumptions to review the feasibility of the sequence.
Activity-based cost loading and planned cash-flow outputs when included in scope.
A readable explanation of the planning basis, milestones and drivers, reviewed against the agreed submission requirements.
Confirm scope, schedule requirements, calendars and planning assumptions.
Connect design, procurement, construction and handover activities in Primavera P6.
Review relationships, open ends and driving paths, then check the agreed contract requirements and prepare the submission package.