EXH Manage — Planning & Project ControlsFREE TOOLS
EXH TOOLS/05 · BASELINE READINESS SCORE
Free pre-scheduling assessment

Know the job before you set the dates.

Twelve questions, two minutes. Find out whether the project is ready for a baseline — or whether the schedule you’re about to build will be guessing at scope, method and sequence.

2 minutes4 readiness areasA study-first action plan
01Answer twelve questions
0 / 12
–Readiness
YOUR RESULT

Answer the questions

Your score updates as you go. Finish all twelve for the full picture.

Get your study-first action plan.

See which of the four areas is holding the schedule back, and the specific steps to close each gap before you baseline.

  • Scores for scope, method, information and team
  • A fix for every gap you flagged
  • A 30-day plan as a PDF
Takes 20 seconds.

By area

YOUR GAPS — AND WHAT TO DO

    A 30-day plan

      Not quite ready?

      Study before you schedule. It’s what we do first.

      A pre-scheduling study turns contract requirements, site constraints and the construction method into a plan your baseline can stand on. Weeks of rework, avoided up front.

      Send a project brief +1 (350) 250-5011
      Built by working planners

      Connected by people. Grounded in construction.

      16U.S. projects and programmes scheduled
      10Sectors, from bridges to data centres
      500 kVUnderground transmission line scheduled
      $165BLargest programme our planners have worked on

      More free tools for contractors.

      See all tools