Know the job before you set the dates.
Twelve questions, two minutes. Find out whether the project is ready for a baseline — or whether the schedule you’re about to build will be guessing at scope, method and sequence.

Answer the questions
Your score updates as you go. Finish all twelve for the full picture.
Get your study-first action plan.
See which of the four areas is holding the schedule back, and the specific steps to close each gap before you baseline.
- Scores for scope, method, information and team
- A fix for every gap you flagged
- A 30-day plan as a PDF
By area
A 30-day plan
Connected by people. Grounded in construction.
More free tools for contractors.
See all toolsXER Health Check
Score your P6 schedule against 12 industry checks in under a minute. Your file never leaves your browser.
Open the tool 02Spec Decoder
Paste the scheduling spec. Get every deadline, limit and submission rule as a checklist.
Open the tool 03Delay Exposure Calculator
See what a late finish costs in liquidated damages and extended overheads — and how much of your margin it eats.
Open the tool 04Notice Clock
Turn a delay event into notice deadlines, calendar reminders and a ready-to-send letter.
Open the tool 06Planner’s Kit
Sector WBS templates, activity codes, update narratives and notice letters. P6-ready.
Open the tool 07Recovery Options Comparator
Overtime, second shift, more crews or resequencing? Compare the cost of recovering days against the cost of being late.
Open the tool